-topped up strb genset coolant 200ml
-topped up strb main engine oil 6 pumps
-complete crew inductions for Kimba Simmonds and Tash chandler. Paperwork complete.
-port side Sami loo not functioning no pump out from port side hold. Port toilet closed and locked off.
-run fire pumps. (Fire drill with Kimba)
*flares- all rockets expire next month
*watch bills has wrong radio stations for Hayman and csm also there’s no man OB ladder on the bow for MOB emergency.
one piece of Tash chandlers paperwork needs to be complete, the check list form, left in WH controls.