-cleaned out all vessel raw water sea strainers (gen, mains, toilets)
-reset star link all ok again now.
-run fire pumps and alarms to test.
-25 guest jackets in tender jacket bag bag, may need one more for deck crew whilst in the tender. Spoken to management and another one will come down for the bag in tender, and an extra crew (red) life saver for onboard RQ
-need to install an inline filter strainer for the toilets. Something finer than the seacock sea strainers.
-life jacket service inspection due 10/02/25
-parachute flares in abandon ship container expire next month on RQ
-MRF toilet raw water possible addition of extra strainer.
-MRF sharp step in tender (removable step has super sharp edges)
-incident report submitted for a little boy that burned his hand and leg with tea and coffee.
-day 1 training for new crew Chase Hudson-Smith
-MRF anchor winch chain stripper mounting bolts sheered, one left, just holding, if that one sheers it will become dangerous and difficult to retrieve anchor even in conditions.
-while operating the davit/cradle the genset RPM dropped and it almost stopped once the hydraulic system stopped the RPM went back up and stabilised, unsure if it’s related still monitoring at this stage.