Welcome back team.
STB main engine surging issue has seemed to stop. Found a electrical issue that has now been bypassed.
AMSA onboard for vessel inspection, not happy with oil and coolant leak on port engine. He has asked SeaLink for a plan to fix the issue asap. Nothing else heard yet.
MSQ onboard to check sullage records and pump out procedure's. He was happy with the system in place.
Cleaned all the mould along inside deck against the walls. We no have mould remover in the stores.
leaking port toilet has been fixed.
Sunday 04/07 full Washdown of vessel including aft deck and ceiling. vessel has had full vacuum and inside floors mopped.
Have put in a MRF to have the vessel fumigated to kill the cockroach infestation that was onboard. We have been spraying Mortein along the floor rails and it has seemed to knock out a lot of them.
Oil @ garbage logs in black folder port side pocket.
Still changing out soaker pads regularly in port engine room. Has been a 0200 run nearly every night for shutdown.
James Grant has been on the slip for maintenance, back in water now but still at slipway pontoon.
Hope you have a good swing and catch you on the roundabout
regards Wolffy.