-inspect and clean out sea strainers main Eng
-run fire pumps
-test all vessel alarms at wheelhouse panel
-MRF 4x new window wipers for wheelhouse frd facing windows, 3!wipers minimum to maintain “rule 5” of collision regulations ‘safe lookout’
-revising SMS missing a few sections need to get emergency preparedness organised
-treating sullage system 2 times per day to gain control of smell,
-make shift mount made for light on strb engine room, 3x heat proof plastic cut and screwed in place of face plate to assist mounting of light. (Secured until new arrives)
-vacuumed all fibre glass dust from strb engine room/main gear box and genset, attempt to re-secure roof lagging it’s very torn along corners it’s sealed again but won’t last to long needs new material for over the top of existing lagging, load of fibre glass/dust/metal fillings in behind it, I vacuumed as much as possible and used silver tape to set lagging back on roof.
*need new sullage treatment liquid, ordering today 15/07/24