Hi Annemaree,
Hope yous have a good on swing . I finished on spirit Friday 12th .
-Berthing at GL3 I'd now in James Grant Berth until further notice while shut down is on
- the ramp we are using at GL3 needs to be pushed back around to normal berth at gl3 once finished . The other ramp is to wide for spirit . We must of used sunrise in James Grant berth last time
- The fwd spring we are using at gl3 is a spare off our vessel was down in the front void . Aft spring is also of our vessel from down in front void . Bow line was already there . And stern line we used of sovereign it had a spare length so can bring that with us as well to keep as spare line .
- Reminder nothing lithium to be left on charge while on break . Radios , iPad , Led lensor light
- the aircons where damaged when they where serviced . Gene advised to run on low fan until repairs have been completed. We have been leaving them all off when on break .
-we changed out water filters that was 9 months from last one . We think maybe try 7 months next . I've put date on white board
- test and tag was completed
- operations bulletin onboard , situation awareness to share in toolbox
- tender winch still not operational