Welcome back on swing.
> Vessel is running well. The port main still leaking oil and coolant.
> The vessel is slow through the water, MRF has been put in to have the hull cleaned and antifouled.
> JG has a charter on Thursday 6.6.24 . Torresian is to do the 0900 run for JG and JG will do the 1400 run for Torresian . Torresian to have a later break , see flagged email
on 20.5.24.
> Pax are now held at the turnstiles at the MOT for the first run until you berth , then inform security that you are good to load. See flagged email 31.5.24
> TAMS are doing sand blasting and painting at GL4 , have requested us to have no wash on arrival and departures. See flagged email 29.5.24
> See all other flagged emails.
> The Stb main has had moments of surging......seems it's the throttle sensor......parts on order. Diagnostic light may come on when you declutch after it has happened.
> The communication junction box has been replaced in the genset.......oil pressure is now stable and the generator doesn't shut down.
> ESA fire service scheduled for Wednesday 19th @ 0745 . See email 4.6.24
> Have also ordered a new hose extension for the vacuum cleaner so we don't have to tape it on. Extension arrived today ( Tiuesday) have not have time to get the old head off as it's rusted on .
> The hose and attachments for the wet vac have gone missing.......so have ordered new.
> New line ordered for the aft running mooring line at the marina.
> See email from Willie (30.5.24) re Lithium-ion batteries. I have ordered 2x batteries to have on charge while the vessel is working as they now can't be charged when we are not on the vessel.
> Jet alarm RPMFB E1 or E2 after prestart checks in the morning, maintenance are aware...but no answer yet.
> There is a new ships log under the dash.
> Toilet seat hinge is broken in the port toilet......MRF is in.......have locket door until fixed.
Have a great swing.
Cheers 🍻
Ross.