6/3 Air cons professionally cleaned today, wheelhouse air con not operating, awaiting parts to be sourced from maintenance yard. 10/3 Wheel house Aircon repaired new circuit board fitted, working fine again
13/3 Periodic electrical survey test conducted today Degreased stb engine room, fresh water rinse bilge area jet unit cleaned Port rear cabin camera replaced Anodes on both main engines replaced Main engines and Genset serviced Women's toilet button replaced.
14/3 DVD unit replaced
As per D.B request and email, BK will now be doing the 1930 from FLNE every Thursday evening Nighttime Bunkering approval has been re submitted and all crew are required to re sign the register located at the end of bunkering procedure in the SMS
19/3 ups changed out again as old one was emitting 110v through charging lead Jeff Davey made aware of our shore power situation via email
20/3 new chart has arrived and stowed in the fwd roof compartment
22/3 changed pads out, MRF lodged for oil leaks Cleaned Genset strainer, found to be very dirty .. In need of barny buster Lodged MRF for FW strainers of gen, FW pump on gen and oil leaks on mains
fridge cleaned for incoming crew
vessel survey cert expires on 31/3, please arrange inspection
Coolant flush still needed on stb side, Richard is aware and will get to it on ya first Sunday maint day..
due to dancer down slipway pontoon we had no access to service yard pontoon on Sunday, chances are you will have the same until birth is free again