Hi all welcome back hope you're break was Devine
fuel gauges still reading incorrectly still dipping tanks .
toped up coolant port and Starboard on the 28/04/24.
STB engine had the boost compensation increase on the 30/04/24.
250 hour service on generator on the 09/05/24.
Gas Detector has been alarming randomly AEGIS hav looked at it as of the 12th no alarm.
minni shutdown in place big shutdown in June so ive been told.
vessel was scrubbed down Sunday 12/05. engin Rooms washed out and degreased along with weekly and 2 weeklys.
3 monthly checks completed 14/05 - ESR for orange smoke flare submitted to replace one due to expire 06/24
life rafts due for inspection 30/05 & 01/06 email sent to maintenance (See emails)
Have a great swing guys
regards Wal.