-clean decky cleaning cupboard re-arrange storage and make tidy.
-clean fire locker/storage area.
-created paper monthly cleaning list added tasks to monthly and weekly cleaning list, more applicable to our boat.
(Bain Marie deep clean bottom and cooling plates in monthly, Bain Marie- lift all black plates and clean side grates and top in weekly )
(Printed and stored in maintenance folder)
-deep clean out Bain-Marie bottom around cooling plates and top
-clean aircon filters
-inspect seawater strainers
-clean vacuum filters
-crane Voc complete for Harry huigsloot, sent in boat bag to office. Have put him on crane yesterday and would like to have him on crane Wednesday when your master me decky to solidify the skill.
Stowing tender easier with less steps will demonstrate Wednesday, smooth fail safe no confusion all crew who have tried confirmed easier and safer / less wear and tear.
-star link active now, password is the name of the connection. Only works in wheelhouse had it faintly working for one day on computer and eftpos but didn’t connect again Monday, still using old method of payment (tabs)
-tender- replace yellow non slip strips on the side boarding steps.
-tender- replace water hose connection on static flush connections.
-spliced new securing line onto main vessel boarding ramp.
-top up Sani-loo
-test toilet + fresh water back up 24v systems inspect and clear all strainers and filters attached.
-inspect and clean all bulkhead/ deck hatch seals
*some engineering works have happened this last week, not sure what though, no records left in maintenance log.
see you in the am, have a lovely night mate