-continue monthly Dataweb maintenance/cleaning lists.
-create new paper/electronic maintenance/cleaning lists.
-updated DataWeb paper weekly, 2 weekly, monthly lists.
-pt main 600ml coolant added
-toilet seat secure nut + both snapped (portside head) MRF submitted.
-top up crane hydraulic oil 30ml
-clean hatch seals + bulk head seals.
-re-stuck hand towel dispenser onto toilet wall.
-1x pax picked up from eureka 2 sailing vessel, in tongue bay, guest was to sick to continue on sailing vessel for the next 3 days, as we return today was a better option for her, 52 total guests onboard now.
-continue maintenance and cleaning lists (dataweb)
-grease crane booms/slides
-grease and align rudders
-inspect hydraulic lines and connections for steering, all ok.
-Inspect fresh water + tap strainers
-MRF raw water line into port genset sea strainer (super clamp failing, non onboard to replace)
-printed weekly cleaning list and updated maintenance weekly, 2weekly, monthly printed lists.
*** ensure float switch feed for strb side specifically stays turned off via the PLC control, due to the strb main engine room float being stuck in the "on" position it will continuously run the main engine bilge pump while dry. when you start up the PLC check the floats are off after, also when shutting down after you select exit mode on the PLC it also can engage the float switch feed again, so ensure the float switch feed and those bilge pumps are infact off after shutting down,
have a lovely couple days and feel free to call if you have any questions.