Hi Dan,
Vessel running well.
Not much to report.
Please read any flagged emails.
Wing station Cameras still non operational. I have sent another email to Management regarding this.
We have tidied up all the bowsing lines on both Port and starboard sides.
We have also fixed up the blue wrap where it is peeling off in spots and at the seams.
When berthing at GL3 the Teflon rubbing Strip 3rd one in from front of pontoon is only holding by one bolt. We have secured it with duck tape and 12 mil rope. MRF Submitted for replacement of teflon strip. It happened whilst berthing in 30 knot blow on wind and incoming tide. Incident report submitted but no damage to vessel.
Antifoul coming off everywhere. I have sent email to Gene, Rob, Willy and Sean regarding this and also given Sean a sample of the antifoul.
Port side Genset shutting down more than normal. Maintenance coming down to look at tomorrow.
Aegis coming to calibrate gas detectors 16th and 17th April.
Have a good swing.
Annemaree 🙋♀️
Please see email re GL4, Tams working there from Monday 8th of April, no Wash required at times.Ian added this.
Liferafts due for service over next two swings.
New lifting bridal being made for tender(tested and tagged).