Mrf broken rear rail stb side where previously welded have removed and waiting to get replacement insert one made so will have to make sure crew arming tenders
double polished all accessible windows
pressure wash and chlorine aft deck
clean rust midships doors
wash and spray gazebos
cleab mould of top deck
remove exhaust stains
remove mould on tender floor
pull out all tender saftey gear dry and repack
refit tender ramp and stow all cruise ship equipment
Organise store sheads
replace door handle on disabled toilet waiting for correct size handle
crane training with Maddison
mr and incident leaking hydraulic line on crane on valve block bottom of
ram have tighten and tested and seems to not be leaky anymore but just keep an eye on
mrf rudder indicators to get fixed
low voltage alarm for dc came on at the beach in the afternoon checked voltage and current draw all was fine so maybe faulty gauge ?
will need ice and milk