Vessel slipped on thursday 25th of feb for inspection of shaft, all was good.
Generator serviced 26th of feb.
Make sure you enter your chart corrections into Dataweb and the ntm number on the bottom of the chart.
Engineers put a new coupling on the port engine, 26.02.16
Got two new fenders from the slip way
please read email about epirb, 02.03.16
Noticed there was a bit of the fender missing on the lower side of the port bow, took photo and put in a mrf.
Mrf put in to fix fenders.
Check all emails, all mpv runs are now on the DataWeb home page for c.b and trojan, scroll down to bottom of page,
Well still get mpv and ships schedules sent through by email, cross check them to make sure.
House battery was changed out, after stinking the wheelhouse out.
Theres a new flip chart and policies on the bench.
Chech q ships for incoming ships not gpc.
New raw water pump on the port engine.
Night crew, Theres a ship due in late Saturday night, early sunday morning.
Still doing bruce transfers at 5am, and most weekends in the afternoon, 1520 on Saturday and 1400 on sunday.
Put a rec in about leaking port window and some soaker pads.