Hand over notes for the 1- 7/01/24
1/1 doc created. Letisha and Erica completed a man overboard drill and fire drill. Ran pump and it ran well, hose running well. The pressure for the fire hose is a bit weak though. Soapy washed starboard side windows.
2/1 cleaned and checked all sea strainers. Port and bow windows soapy washed. 3/1 ran aux pump. Running well.