Hi Ale,
The vessel has been running good not too much to report. You have Scott on with you for first week so he can give you run down on engineering side.
- Fire equipment inspection due 28/2/16. I've emailed Dave but he hasn't confirmed when they will do it.
- I asked about our feb PFD and he said as we have enough onboard atm it won't be coming straight back to boat, as they are low on numbers. Probably check again end of this week.
- Dave has told us to keep the office UHF radio onboard
- Port aft back up throttle control dial doesn't work on occasions, each morning I test it and sometimes in work sometimes it doesn't even after setting the dial to 0 first. MRF completed and Richard aware.
- All tv/dvd/music playing through p.a has been good for the last 2 weeks on the volume settings they are on now. Ian Zwies reported that it was making a really bad sound possibly interference.
- 0540hr run in morning is leaving on time regardless of people onboard as per Craig Martin request.
Have a good swing,
Oli