Welcome back guys
- MRF submitted for braided fuel lines on port main injector pump as they are leaking-(new lines fitted Monday 9/9/23).
- full fuel.
- full water and sewerage emptied.
-ordered a broom handle with a scouring pad attachment to scrub all coal dust of as we received the vessel quite dirty and truck Wash just wouldn't get it off.
-vessel scrub down bow and port side Monday 2/10/ 23 and also full vessel 13/10/23 including all the brows as the were filthy and coal dust was caked on.
- maintenance checks up to date no issues port main seacocks inc Genset have been vacuumed out and scrubbed and sucked out again and are nice and clean.
- been doing a lot of training with brad.
- STB bilge manifold ( to fire was around the wrong way so we put it as to how it should be as the sms has a pic in it and it does not match the manifold could get confusing for trainees.
- chart corrections all up to date.
-coolant still leaking port side so still keeping a close eye on that situation.
- STB SIMRAD power button faulty mrfd on 7/10 as per Brody s instructions he also has part number.
- port and Stb bilges have been degreased and scrubbed the port side was really caked in oily sludge. There was 1.5 litres of oil under the Genset so maybe that is the oil that leaks down the stringers and Brody informed me that the oil leak was fixed a while ago.
- 250 and 500hr mains service on 9/10/23.
-cool summers aircon annual clean scheduled for 24/10 at this stage see calendar for invite and I'm sure you will receive emails regarding.
- MRF submitted and approved for oil and fuel leak on STB mai Eng and oil pump hopefully fixed soon
- see flagged emails
- gas sniffer service due 21st October or 22nd see email
cheers Ryan
seeyas on the next one 👍