Weekly operational handover 26/9-2/10
27/9 rusty stainless steel cleaned on top deck
28/9 cleaned fridges. 29/9 cleaned and checked port engine, port tillerflat and starboard tiller flat sea chests. Soapy washed port side, bow and stern of vessel.
30/9 Checked and cleaned out starboard side Gen and main engine sea strainer.