Hi all,
Everything is running as it should apart from the Radar and one of the VHF units *see notes above.
Main motors and genset all running well. We did have an issue mid swing with the starboard main stalling after start ups, but maintenance seem to have that all sorted now. At the moment there is a scheduled 0325 run. There hasn't been too many on it and I believe it only goes until Saturday morning.
All check are up to date but fortnightly ones due Thursday.
The dredge Brisbane is working through the harbour. It has been up the Jacobs Channel the last few days.
There is a new CCTV system which is much clearer than the old one. Unsure if there's a live feed through to the office though?
We are not to access the top deck at the moment until new harnesses are supplied and non slip surfaces are repaired.
* 1/08/23 main engines had 250/500 hour services
* 3/08/23 Genset 500 hour service carried out
* 4/08/23 new shore power lead as the old one was damaged
* 5/08/23 fire pump repaired (new bolt installed)
* 7/08/23 new control box installed in the wheelhouse for starboard fire alarms as old one stopped working
* 9/08/23 anchor control wiring repaired as it was faulty.
That's about all i can think of for now, I hope you have all had a great offswing and the on swing is a good one.
thanks,
Steve