-clean out toilet sink smell traps bleached soaked and scrubbed.
-clean main engine + genset air filters.
-clean aircon filters
-remove mould from fuel coffer dams pt and st
-clean out all seawater strainers for main engines and gensets and fresh water strainers/tap heads.
-remove mould from around toilet sink trims and edges.
-clean out dishwasher and soak filter overnight.
-complete weekly/fortnightly/monthly cleaning and maintenance lists (Dataweb) created new lists.
-ships horn re-connected
-clean whites at entrance to saloon
-free crane hook (was seized)
*found hole in aft deck carpet at loading area for tender.
*found hole in new awning roof.
*noticed small oil leak/spill Near Strb Genset catch can, I Cleaned but hasn’t returned not sure how or when it got there ?
*MRF submitted for toilet raw water taps at base of each toilet (seized) needs replacing on all 3 of them and need 3x new 450mm hoses and fittings to connect, deteriorated as well.
All toilet plumbing gear ordered via Gary.
*planned to do drills to complete Isla but Gary, Rob, Isaiah arrived to the boat and we were not left with anytime, can we do together on Thursday I’m not on tomorrow as I have a doctors appointment.
*All Isla Mccolls legal and sealink inductions are complete other then a set of drills and she still needs to do a crane induction when the boats not full or spare time available.
don't need any ice or milk