Kimba,Rhiannon and Jade all signed off on crane opps
inspected horn connection had green death all through submitted mrf, Nathan came the next day to remove switch to order new ones so still have horn available on stb wing and helm
replaced zip tap head after old one failed , box for old one is under seat lower cabin aft port will have to go back to Gary if they can fix if not in bin
Upper cabin port side door lock stuck in lock position so used grey duck tape over the barrel to ensure can still use the door, mrf submitted I think may be coming Monday
service crane and remove rust stains
checked all float switches, alarms and high water activated pumps submitted another mrf to get a buzzer speaker for alarms on plc in hopes to be installed on slip and also bypass switches to activate pumps in event plc goes down
noticed that coolant in stb man had already turned clear and smells very burnt which is weird, producing a lot of brown water out of exhaust on start up mrf submitted and email to Gary about it
will need ice and milk