-Crew-Jade, Makka, Rhiannon, Kimba- completed crane induction forms
-Clean out sea water strainers for gensets and main engines.
-top up 200ml coolant Strb main engine.
*need to grind back some sharp screws/edges in Strb eng room.
*strb engine room ear muffs snapped - ordered a new pair from Gary.
-dave + Sophie complete crane induction form.
-complete weekly/monthly maintenance and cleaning lists- recreated new lists.
-inspect all fire extinguishers + shake.
-run all fire pumps.
-service anchor winch-grease nipples + tighten collar securing bolt, tighten chain stripper bolt.
-check/inspect all battery terminals and connections.
-clean aircon filters and grates, inspect condensers securely mounted and free of deterioration and damage.
-clean vacuum filter bags and wash.
-remove scuff marks from stairs to mid deck.
-run pt Genset to circulate fluids and ensure equipment is functional for use in emergency.
*received new back up sullage transfer pump and new ear muffs, ear muffs in English room, sullage pump stored in decky/cleaning locker.
*Vessel horn short circuited again on departure disconnected air pump power supply, attempted to connect again at south whitehaven beach, attempt failed system still short circuiting most likely at port wing control due to water ingress into panel.
*Horn still not working.
milk x 1, ice x 3