Welcome back lad's
GL4 Pontoon maintenance is complete so everything is back to normal over there
Charts up to date, there is a laminated card in the port side pigeon whole detailing how Willie would like us all to fill out our chart corrections from here on both, on the charts and, DataWeb 7/08/23 250 hour service completed.
Carl has fitted a pressure sensor alarm to the Genset, if the pressure drops below 2.1 bar the alarm will sound.
Genset is still cutting out reading low oil pressure occasionally.
all checks up to date
ESA inspection completed so all firefighting equipment good for another 6 months.
Oil & Coolant still leaking profusely on port main. Both find their happy spots and just spit straight out if topped up too much.
new steel ordered to replace the hook for the forward spring at GL4. Also 10mm line to run from the back of the fender to the middle of the forward spring to hold it above the tyre. new float switch port main Engine room fitted
1st aid kit due for inspection 20/06/23
Orange crew PFD due in July 23
Have a good swing boys
Cheers
Joey