Welcome back team,
Annual checks completed (passenger lifejacket inspections completed as part of that)
all vessel checks are up to date
Jet control essembly replaced
I Have submitted an MRF for the oil leak in port engine. I have also ordered a new drum of engine oil.
new cctv monitor installed Stbd wheel house
see flagged emails regarding the GL4 pontoon resleeve project, commencing 03/05/23.
It's a bit of a convoluted email thread but, they do have the engineers drawing plans for the project in there and, Alisa will also liaise with you in the morning as she gets on board. There may be times where Torresian has to berth on the inside at GL4.
Generator Davey pump removed cleaned and cleared of all the shells, barnacles and refitted.
oil pressure switch and sender replaced on generator.
runs are status quo at this stage.
Upholstry clean completed today 2.05.23
vessel is a bit laboured/ slow. Needs a bum clean
hope that's everything
any issues feel free to give me a call
Have a great swing
cheers
Joey