Hi ya all.
Hope you have an easy Christmas filled with laughter.
* Sean England is investigating if the MOT new paint surface becomes slippery when wet. We believe it does & have been using the rubber midship door way mats on the pontoon at the base of the stairs off the ramp. Bruce from QcLNG is testing surface tomorrow & will report back to Sean. Please touch base with Sean to see if there are any other precautions we can take when it rains.
* maintenance conducted 250 hr checks & replaced anodes on the 8/12/25
* vessel taken to the slipway over weekend on the 12/12/25 to carry out work on heat exchanger & inter cooler. Maintenance is going to schedule the starboard mains to have heat exchanger & inter cooler changed out for clean ones in the shed. * soaker pads were changed out on weekend 20/12/25
have a great swing.
Jodie.