Hi Jody,
Welcome back to the swing.
1)All maintenance schedules are completed and submitted.
2)All mains and auxiliaries are running well.
3) Stbd mains gearbox oil cooler lines were replaced. Also carried out 250/500hrs service. Service to port mains is pending.
4) MRF forwarded to replace Sullage tank breather filter as crew complained about sewer smell from vent at the wall in Stbd rear corner.
5) Post injury to the crew member on board Parangool whilst line handling, new loopy tag lines made mandatory and are attached to the eye of Fore-springs at Marina berth, Mot and QC4. Please be aware that loop would tangle with the midship aft cleat when throw the Fore- spring over the holding line when casting off at QC4. This has happened and initiated hazard report.
6) Toilets scrubbed down and cleaned including floors. Sanitary bins changed as per the schedule.
7) Engine and jet rooms are given general clean and replaced soaker pads 8) Fuel was bunkered on Monday as an outage was scheduled on Tuesday.
9) Did not notice any discrepancy in time counter clock in Port Genset.
Thats is for the briefing, and have a nice Swing.
Jag