Hi Jag,
Brody has replaced
* zip hot water system
*taco guages
* wiperblade number 5
* fixed level tube on fresh water guage.
* replaced coolant o- Ring in Stbd fwd main engine heat exchanger
* fit & plumb in water filter system in cafe galley
* bolt in aft stbd boarging gate
Shaun replaced
*Port Aft Aftercooler to mixer rubber hose
*Port Aft mixer to pong box hose
Port aft and Stbd aft mains are going through approx 1 litre of oil every 3-4 days.
Compass was adjusted on the 3rd of June.
We were asked to do touch and goes at GL3 in James Grant berth on the 4th of June. Willie meet us there and we measured out lines for the up coming shutdown. The line measurements are as follows.
* 5.6 m Fwd Spring line. Measurement is bollard to bollard, fixed line. 40 mm line
* 2.3 m Aft Spring line. Measurement is bollard to bollard, please add 1.5 m for tie up. 32 mm line.
* 16.6 m Stern line. Measurement is bollard to bollard, please add 1.5 m for tie up. 32 mm line.
* approx 8 meter of line will be needed for now line. 32 mm line
I have order 9 m of 40mm to allow for just over 1.5 m each end for splicing.
I have order 27.9m plus 4.5 m for splicing and 4m for tie off. = 38.5 metres of 32mm.
Both engine rooms cleaned, bilges degreaser and soaker pads replaced on the 4/6/19.