Hi all ... Boat all good. Did a clean up in engine rooms and sucked out all bilges could be a bit left after is settles forward. Jet rooms have been cleaned and soaker pads replaced.
Epirb registration due December 17
have put in request for all the stickers around the boat that have faded to be replaced. Have sent Krystle a list and size of most of the stickers
In each air vent of the engine I have put a length of rope. This is to help me lower and retrieve full 20lt containers of builge water and oils
dug out all the lanox and inox from the engineers room and put them in the chemical cubourd with the others. feel free to change it around if you wish but keeping it together I can watch what I order
Have put in an MRF for the port side jet room . oil leak on inboard jet unit pls monitor
have a great swing jag and a merry safe Christmas to you and your family.... Paul